English / العربية / Français / ελληνικά

English / العربية / Français / ελληνικά

 Construction Cost Index, Road Cost, Water Networks and Sewage Networks in the West Bank

Palestinian Central Bureau of Statistics (PCBS)

 Construction Cost Index (CCI), Road Cost Index (RCI), Water Networks Cost Index (WNCI) and Sewage Networks Cost Index (SNCI) in the West Bank* during April, 04/2021  

Increase in the Construction Cost Index (CCI) for Residential Buildings

The Construction Cost Index (CCI) for residential buildings reached 110.26 with an increase of 0.89% in the West Bank* during April 2021 compared with March 2021 (base year 2013=100).

At the level of major groups, the prices of raw materials increased by 1.51%, and rental of equipment slightly increased by 0.07%. At the same time, labour costs and wages remained stable during April 2021 compared with the previous month.

Increase in the Construction Cost Index (CCI) for Non-residential Buildings

The Construction Cost Index (CCI) for non-residential buildings reached 109.84 with an increase of 0.86% in the West Bank* during April 2021 compared with March 2021 (Base year 2013=100).

At the level of major groups, the prices of raw materials increased by 1.42%, and rental of equipment increased by 0.10%. At the same time, labour costs and wages remained stable during April 2021 compared with the previous month.

Increase in the Construction Cost Index (CCI) for Skeleton Buildings

The Construction Cost Index (CCI) for skeleton buildings reached 110.26 with an increase of 1.52% in the West Bank* during April 2021 compared with March 2021 (Base year 2013=100).

At the level of major groups, the prices of raw materials increased by 2.41%, and rental of equipment slightly increased by 0.07%. At the same time, labour costs and wages remained stable during April 2021 compared with the previous month.

Increase in the Road Cost Index (RCI)

The overall Road Cost Index (RCI) reached 107.92 with an increase of 0.35% in the West Bank* during April 2021 compared with March 2021 (Base month December 2008=100).

At the level of major groups, the prices of raw materials increased by 0.57%, and rental of equipment slightly increased by 0.09%, while operating costs of equipment and maintenance decreased by 0.15%. At the same time, labour costs and wages remained stable during April 2021 compared with the previous month.

Increase in the Water Networks Cost Index (WNCI)

The overall Water Networks Cost Index (WNCI) reached 119.09 with an increase of 0.83% in the West Bank* during April 2021 compared with March 2021 (Base month January 2010=100).

Water Reservoirs Cost Index reached 112.60 with an increase of 2.00%, and Water Networks Cost Index reached 122.03 with an increase of 0.35% during April 2021 compared with the previous month.

Slight Decrease in the Sewage Networks Cost Index (SNCI)

The overall Sewage Networks Cost Index (SNCI) reached 109.19 with a slight decrease of 0.04% in the West Bank* during April 2021 compared with March 2021 (Base month January 2010=100).

Notice:

  1. Due to COVID-19 pandemic and inability to conduct face-to-face interview, data for CCI, RCI, WNCI and SNCI has been collected using mobile phones.
  2. Gaza Strip data is not available.
  3. The difference in the percentage change in major groups of roads, construction, water networks, and sewage networks cost index is due to the nature compositions of these major groups.

Note:

*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967.

spot_img
spot_img

Latest articles

Related articles

spot_img